Rusted old crawler tractor sitting on red dirt beside a fence

Track frames, rollers and an engine block, all still worth hauling.

Home › Hauling a crawler

Lowbeds, winches and permits

How a crawler gets hauled

Moving a tracked machine is the part most sellers worry about. Here's how we do it, so you know what to expect on pickup day.

  • Tilt decks
  • Lowbeds
  • Permits handled

Machine report

Tell us what's sitting there

or call 236-239-0420

Spec sheet

Which deck for which machine

Minis and CTLsTilt deck or small trailer.
Small dozers and loadersTilt deck or lowbed.
Mid-size machinesLowbed.
Large machinesLowbed, sometimes with parts removed or an oversize permit.
CranesSeveral loads, planned in advance.
Yellow crawler loader with its bucket down in a gravel yard
Track loaders: bucket, arms and undercarriage all count.

On the day

What we need from you

  • A clear path from the machine to where the truck can park
  • Gates open and vehicles moved
  • Someone who can sign the bill of sale
  • Proof of ownership, and a lien release if needed

Moving tracked machines safely

Every machine and site is a little different. These are the things we plan for.

Running machines

If it tracks, it can usually drive onto the deck. That's quick.

Dead machines

Dead machines get winched. Locked tracks skid up the ramp.

Height

Cabs, canopies and booms add height. Some routes have low bridges, so we check.

Width and weight

Wide or heavy loads need provincial oversize permits and set routes. The hauler arranges them.

Soft ground

A loaded lowbed is heavy. On soft fields we wait for dry weather or load from firm ground.

City sites

Street loading in the city may need a permit or a lane closure. Site managers usually know the process.

Removing parts for transport

Some machines are lighter or lower once a bucket, blade or counterweight comes off. We decide that before pickup so it doesn't surprise anyone.

Loading dead machines safely

Winching a dead machine is slow and careful work. Nobody stands near the cable while it's under load.

Chaining down

Every machine is chained at the frame and its attachments are lowered and secured before the truck moves.

Weather

Rain makes ramps slippery and fields soft. We'll reschedule rather than risk a bad load.

Straight answers

Questions we get

Do I pay for the haul?

No. The haul is included in the quote.

How long does loading take?

Usually under an hour for a running machine. Dead machines take longer.

Can you load from a tight lot?

Often. Photos help us plan.

Worried about moving it?

Call and describe the spot. We've probably loaded from worse.

236-239-0420
Call 236-239-0420