
Track frames, rollers and an engine block, all still worth hauling.
Home › Hauling a crawler
Lowbeds, winches and permits
How a crawler gets hauled
Moving a tracked machine is the part most sellers worry about. Here's how we do it, so you know what to expect on pickup day.
Machine report
Tell us what's sitting there
or call 236-239-0420
Spec sheet
Which deck for which machine
| Minis and CTLs | Tilt deck or small trailer. |
|---|---|
| Small dozers and loaders | Tilt deck or lowbed. |
| Mid-size machines | Lowbed. |
| Large machines | Lowbed, sometimes with parts removed or an oversize permit. |
| Cranes | Several loads, planned in advance. |

On the day
What we need from you
- A clear path from the machine to where the truck can park
- Gates open and vehicles moved
- Someone who can sign the bill of sale
- Proof of ownership, and a lien release if needed
Moving tracked machines safely
Every machine and site is a little different. These are the things we plan for.
Running machines
If it tracks, it can usually drive onto the deck. That's quick.
Dead machines
Dead machines get winched. Locked tracks skid up the ramp.
Height
Cabs, canopies and booms add height. Some routes have low bridges, so we check.
Width and weight
Wide or heavy loads need provincial oversize permits and set routes. The hauler arranges them.
Soft ground
A loaded lowbed is heavy. On soft fields we wait for dry weather or load from firm ground.
City sites
Street loading in the city may need a permit or a lane closure. Site managers usually know the process.
Removing parts for transport
Some machines are lighter or lower once a bucket, blade or counterweight comes off. We decide that before pickup so it doesn't surprise anyone.
Loading dead machines safely
Winching a dead machine is slow and careful work. Nobody stands near the cable while it's under load.
Chaining down
Every machine is chained at the frame and its attachments are lowered and secured before the truck moves.
Weather
Rain makes ramps slippery and fields soft. We'll reschedule rather than risk a bad load.
Straight answers
Questions we get
Do I pay for the haul?
No. The haul is included in the quote.
How long does loading take?
Usually under an hour for a running machine. Dead machines take longer.
Can you load from a tight lot?
Often. Photos help us plan.
Worried about moving it?
Call and describe the spot. We've probably loaded from worse.
